2A  Chinese Factory Wholesaler & Exporter Type Construct Centrifugal Heavy Duty Clutch Pulley with 25mm bore

Our experts and engineers have 23 a long time of Encounter in the Bearing Sector.

Overview

Quick Particulars

Relevant Industries:

Production Plant, Equipment Fix Outlets, Vehicles&Add-ons

Variety:

V-Belt

Content:

iron

Location of Origin:Zhejiang, China
Model Identify:

OEM

Merchandise name:

2A 25mm 138mm clutch pulley

bore:

25mm

diameter:

138mm

belt:

A sort

engine:

25hp

net fat:

three.05kg

Application:

go kart/scooter/atv/utv/beach front buggy/dune buggy/snowmobile /lawn mower

CPNO:

PDP.00016

Source Potential

Supply Capability:
ten thousand Piece/Pieces for each Month

Packaging & Shipping and delivery

Packaging Information
1) carton with pallets.

two) personalized colour box with pallets.

three) a single piece G.W is two.five kg.

four) dimensions: 11cm x 11cm x 6cm.”>2A Variety Assemble Centrifugal Hefty Duty Clutch Pulley with 25mm bore

1) carton with pallets.

2) personalized colour box with pallets.

3) one piece G.W is 2.5 kg.

four) size: 11cm x 11cm x 6cm.
Port
NINGBO/SHANGHAI PORT

On the web Customization

2A Kind Build Centrifugal Heavy Duty Clutch Pulley with 25mm bore

Solution Description

Specs:
Go well with 25 hp motor
25bore
A type belt pulley
The outdoors diameter of pulley : 82mm
Application : centrifugal clutch is for go kart/scooter/atv/utv/beach buggy/dune buggy/snowmobile /lawn mower

Firm Details

 

     Wenling EPG Machinery Manufacturing facility was launched in 1998. We are a branch of Vivid Keeping Group Minimal and situated in Binhai Industrial Region, HangZhou, Zhejiang Province. We have expert engineers and management group in the generating of the scooter and bike parts for U.S.A, Russian, Europe, Brazil, and other nations. We have adequate capability to fulfill various requirements from yours in this discipline. Who could bring a good deal of worldwide expertise and specialist and an unparalleled degree of provider for you.

Our Solutions

Packaging & Delivery

FAQ

Q1. How to pay?

A: TT, PAYPAL, WEST UNION, DP, DA, Credit card up to you.

 

Q2. What is your term of delivery?

A: EXW, FOB, CFR, CIF, DDU.

 

Q3. How about your delivery time?

A: Generally, it will take 24-48 hours after receiving your advance payment. Some is one week. The specific delivery time depends on the items and the quantity of your order.

 

This autumn. How to produce customized products?

A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

 

Q5. How to get a sample?

A: We can supply the sample if we have ready parts in stock.

 

Q6. Do you test all your goods before delivery?

A: Yes, we have 100% test before delivery.

 

Q7: How do you make our business long-term and good relationship?

A: 1. We keep good quality and competitive price to ensure our customers benefit         2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.