Standard Description
Equipped with the zero leak bidirectional checking sole-noid valves, this power unit is made for the operation of two independent circuits. Which are respectively for the principal and subordinate platforms in the double scissors lift. Two cut-off valves are used for lowering the machine manually in situation of electrical power loss. If a lot more independent circuits are expected for your application please speak to us for availability.
Remark: 1. Please check with our sales engineer to the different pump displacement, motor power or tank capacity.
two. CSA or UL certified motors can be found upon request.
Specific Notes
one. The AC motor is of S3 duty cycle, which might only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean all of the hydraulic
elements concerned just before set up of the power unit.
3. Viscosity with the oil shoud be 15~46 cst,plus the oil must be clean and free of charge of impurities,N46 hydraulic oil is encouraged.
four. The electrical power unit must be mounted vertically.
5. Check the oil level within the tank right after the initial running in the electrical power unit.
6. Oil changing is required following the preliminary 100 operation hrs,afterwards as soon as just about every 3000 hrs.