
assures the steadiness and regularity of the key purpose of elements. More importantly, we make particular areas in accordance to equipped drawings/samples and warmly welcome OEM inquiries. PersonnelOur income people are well qualified to accommodate your requests and communicate English for your convenience. Solution Description
DESCRIPTION
SZG double-EPTTred rotary EPT dryer is a new technology drying equipment our organization deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ed on the foundation of EPT of domestic equivalent goods. It makes use of belt-EPT two elastic coupling manner therefore it runs effortlessly. EPTly designed EPT entirely reflects two very good EPT shafts. EPT medium and EPT program use reliable mechanical seal or US-EPT rotary joint, on which foundation we have deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ed SZG-A, with stepless velocity regulating and continuous temperature handle.
As a skilled drying gear factory, we have every thing you want, from high temperature thermal oil as heating medium-temperature to medium steam and reduced-temperature very hot water. When drying adhesive components, we will EPTTly style quot shoveling plate quot for you or established balls in the tank.
WOREPT Theory
one) Thermal strength source (these kinds of as very hot h2o, reduced strain steam or heat-conducting oil) is pumped into sealed interlayer, and the heat is passed to dried resources by way of inner shell
2) UnEPTTdriving of EPTT, the tank rotates little by little, consistently miXiHu (West EPT) Dis.ng materials, so as to achieve strengthened drying
3) When the supplies are in EPT, vapor force drops, creating moisture on the material floor saturate and evaporate, and then discharged by EPT pump and recovered timely. Inner moisture proceeds a few ongoing procedures of constantly penetrating to the surface, evaporating and being discharge. EPTs can reach the goal of currently being dried in a short period of time.
Characteristics
1) EPTT continual temperature manage is used when the oil is heating. Biochemical goods and raw components can be dried, in a temperature between twenty-one hundred sixty ordmC.
two) EPT thermal effectiveness, far more than two times advancement than common oven.
3) Oblique heating so that the content will not be contaminated. In line with quot GMP quot needs. Straightforward tools routine maintenance. EPT to clear.
4) Utilizing recommended resettlement procedure EPTstration solvent to recuperate resettlement.
Relevant MATERILAS
Concentration, combine and drying of powder, granular supplies and fibers of chemical, pharmaceutical and foodstuff EPTT, or resources demanding minimal-temperature drying(this kind of as biological items). Far more appropriate for drying materials which are easily oXiHu (West EPT) Dis.dized, unstable, heat-JCEPtive, sturdy irritant, toXiHu (West EPT) Dis.c or not permitted to ruin its crystals.
EPTnical Parameter
| Product identify | one hundred | 500 | 750 | 1000 | 1500 | 2000 | 3500 | 5000 |
| Volume inside of the tank(L) | one hundred | 500 | 750 | a thousand | 1500 | 2000 | 3500 | 5000 |
| Volume to fill Raw material(L) | le50 | le250 | le375 | le500 | le750 | le1000 | le1750 | le2500 |
| EPT area (m2) | 1.16 | 2.63 | 3.5 | 4.61 | five.58 | 7.5 | 11.2 | 14.1 |
| Revolution ( rpm) | four – six | |||||||
| EPTT of motor (kw) | .seventy five | 1.five | two | 3 | three | 4 | 5.five | 11 |
| Occupiedarea, L timesW(mm) | 2160 times800 | 2350 times800 | 2560 times1000 | 2860 times1300 | 3060 times1300 | 3260 times1400 | 3760 times1800 | 4400 times2500 |
| Rotating height (mm) | 1750 | 2250 | 2490 | 2800 | 2940 | 2990 | 3490 | 4200 |
| Design strain Inside of the tank (MPa) | -.1-.15 | |||||||
| Design stress of jacket (MPa) | le0.3 | |||||||
| Doing work temp- Erature(oC) | in the tank le85 jacket le140 | |||||||
| When use con- Densator, | 2X-15A | 2X-30A | 2X-30A | 2X-70A | JZJX300-eight | JZJX300-4 | JZJX600-8 | JZJX300-4 |
| Model and EPTT of EPT pump | 2KW | 3KW | 3KW | 505KW | 7KW | 9.5KW | 11KW | 22KW |
| When don,t use Condensator, | SK-.4 | SK-.8 | SK-2.7B | SK-2.7B | SK-three | SK-6 | SK-6 | SK-10 |
| Model and EPTT of EPT pump | one.5KW | two.2KW | 4KW | 4KW | 5.5KW | 11KW | 11KW | 18.5KW |
| Fat(kg) | 800 | 1200 | 1500 | 2800 | 3300 | 3600 | 6400 | 8600 |
EPTT Present
EPTT introduction: EPTTngsu XiHu (West EPT) Dis.ngXiHu (West EPT) Dis.ng Drying EPT EPTT, Ltd.
EPTTngsu XiHu (West EPT) Dis.ngXiHu (West EPT) Dis.ng Drying EPT EPTT,Ltd has estabEPTTd in 1998 and it covers an spot of 15000 sq. meters, possesses fastened asset of USD seven million. The merchandise have exported to US, Singapore, India, Ukraine, Russia, Korea and so on. The business have EPTd manufacturing tools , superb technical team and soon after-sales support.
Certificate
Package:wooden situation
Services:
pre-sale service
We Invite buyers to go to our business and communicate on technical specifications encounter to face.
sale service
Accountable for debugging the tools according to customers’ demands of a variety of complex info. Our engineers will prepare our clients about equipment features and operation important factors to make sure the gear managing in the greatest problem.
following-sale provider
We give installation, debugging, upkeep, training and other companies Supply relevant complex data, tools, software and associated GMP certification materialsSet up following-income services hotline, and organize personnel to visit clients each 12 months to know much more consumer needs,like consumer operation issues in the procedure of manufacturing tools.
quality guarantee
Our organization promises strictly operate the ISO9001 top quality technique certification stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds and pharmaceutical gear GMP audit needs,guarantee we supply new tools. JCEPd EPT,excellent quality.EPT operation risk-free dependable, affordable, straightforward to maintain.
EPT guarantee time period is one yr,all the areas for the gear choose nicely-acknowledged brand name.Throughout the warranty when gear have issue in top quality like equipment failure and harm,EPT for cost-free maintenance or alternative.
We look EPTT to cooperating with companions from all above the planet to create win-earn cooperation romantic relationship in EPTT term. Welcome for your browsing.
Previous EPTT
FAQ:
1. Q: Please describe your guarantee time period.
A: 15 months soon after the equipment is arrived at the location port or twelve months after the installation and commissioning of the gear, whichever will come first.
2. Q: Do you provide on-internet site installation and commissioning?
A: Sure, we do. If on ask for, we’ll offer the assistance of on-site set up and commissioning. Typically a single mechanical engineer and one EPT engineer to assist.
3. Q: How about the EPT of on-web site set up and commissioning assistance?
A: The EPT is made up of round-trip air tickets, room and board costs, service EPT (labor EPT), and website transportation (or right presented by client), which shall be compensated moreover.
4. Q: Are you a manufacturing facility or a buying and selling firm?
A: We are a skilled producer. We have own manufacturing unit and pilot EPTT for consumers to do sample tests.
