
We offer you OEM provider. EPG was awarded with “popular product of Zhejiang Province” and “well-known manufacturer of Zhejiang Province”. we offer you one-quit resolution for the acquire of mechanical power transmission products in China.
RV sequence Traits
- RV – Sizes:030-040-050-063-075-one hundred and five-a hundred and ten-a hundred thirty-one hundred fifty
- Input Possibilities: with enter shaft, With Square flange,With Enter Flange
- Input EPTT .06 to eleven kW
- RV-Dimension from 030 to a hundred and five in die-cast aluminium alloy budy and above one hundred ten in forged iron
- Ratios between 5 and 100
- Max torque 1550 N.m and admissible output radial hundreds max 8771 N
- Aluminium models are provided total with synthetic oil and allow for EPT mounting positions, with no require to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Measurement 030 and in excess of are painted with RAL 5571 blue
- Worm EPT EPTTs are offered with diffferent combinations: NMRV NMRV, NMRVEPTT NMRV, JWB NMRV
- NMRV, NRV VS,NMRV AS,NMRV VS,NMRV F
- Possibilities: torque arm, output flange, viton oil seals, minimal/higher temperature oil, filling/drain/breather/amount plug,Small hole
Fundamental types can be utilized to a wide assortment of EPTT reduction ratios from five to one thousand.
Guarantee: One particular year from date of supply.
| WORM EPTT | |||||
| SNW Series | Output Velocity Selection: | ||||
| Sort | Previous Kind | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
| SNW030 | RV030 | 21N.m | phi14 | Relevant EPT EPTT: | |
| SNW040 | RV040 | 45N.m | phi19 | .06kW-11kW | |
| SNW050 | RV050 | 84N.m | phi25 | Enter Options1: | |
| SNW063 | RV063 | 160N.m | phi25 | With Inline AC EPT | |
| SNW075 | RV075 | 230N.m | phi28 | Enter Options2: | |
| SNW090 | RV090 | 410N.m | phi35 | With Sq. flange | |
| SNW105 | RV105 | 630N.m | phi42 | Enter Options3: | |
| SNW110 | RV110 | 725N.m | phi42 | With Input Shaft | |
| SNW130 | RV130 | 1050N.m | phi45 | Input Options4: | |
| SNW150 | RV150 | 1550N.m | phi50 | With Input Flange |
EPT
ZheJiang EPT EPTT,Ltd,the predecessor was a condition-owned navy mould EPTTrprise, was estabEPTTd in 1965. EPT EPTTizes in the full EPTT EPTT answer for higher-end equipment production EPTT dependent on the goal of quotPlatform Merchandise, Application Design and style and Specialist Provider quot.
EPT have a powerful technical power with above 350 personnel at current, incXiHu (West EPT) Dis.Hu (West EPT) Dis. over 30 engineering technicians, thirty top quality inspectors, covering an location of 80000 sq. meters and kinds of EPTd processing EPTTs and testing equipments. We have a good basis for the business application deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment and provider of substantial-stop speed EPTTs amp variators proudly owning to the provincial engineering EPT investigation cEPTTr,the lab of EPT speed EPTTs, and the foundation of present day R ampD.
Our Staff
EPTT EPTT
EPTT:Insist on EPTTrovement,Attempt for Excellence With the deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment of products production indurstry,consumer by no means satirsfy with the existing quality of our merchandise,on the contrary,wEPT the price of top quality.
EPTT plan:to enhance the overall level in the area of EPTT EPTT
EPTT Look at:Steady EPTTrovement , pursuit of excellence
EPTT Philosophy:EPTT EPTs value
3. Incoming EPTT EPTT
To set up the AQL acceptable amount of incoming material handle, to give the content for the EPTT inspection, sampling, immunity. On the acceptance of experienced products to warehousing, substXiHu (West EPT) Dis.Hu (West EPT) Dis.rd items to take return, verify, rework, rework inspection liable for tracking bad, to monitor the provider to take corrective measures
to prevent recurrence.
four. Method EPTT EPTT
The production web site of the initial examination, inspection and final inspection, sampling according to the needs of some assignments, judging the high quality change pattern
located irregular phenomenon of producing, and supervise the production office to improve, remove the abnormal phenomenon or state.
five. FQC(Ultimate QC)
After the producing office will full the item, stand in the customer’s place on the completed merchandise good quality verification, in order to make sure the top quality of
customer anticipations and demands.
6. OQC(Outgoing QC)
Right after the product sample inspection to deterEPT the certified, allowing storage, but when the completed product from the warehouse ahead of the formal supply of the items, there is a check out, this is referred to as the cargo inspection.Check out content material:In the warehouse storage and transfer standing to validate, whilst confirming the shipping and delivery of the merchandise
is a solution inspection to deterEPT the qualified products.
EPTT
Delivery

