{"id":3655,"date":"2021-01-18T04:28:33","date_gmt":"2021-01-18T04:28:33","guid":{"rendered":"http:\/\/gear-coupling.top\/?p=3655"},"modified":"2022-11-17T06:39:40","modified_gmt":"2022-11-17T06:39:40","slug":"electrical-power-units-for-double-scissors-lift","status":"publish","type":"post","link":"https:\/\/gear-coupling.top\/th\/application\/electrical-power-units-for-double-scissors-lift\/","title":{"rendered":"Electrical power UNITS FOR DOUBLE-SCISSORS LIFT"},"content":{"rendered":"<p>Standard Description<br \/>Equipped with the zero leak bidirectional checking sole-noid valves,  this  power  unit  is  made for the operation of  two independent circuits.  Which  are  respectively for the principal and subordinate platforms in the double scissors lift. Two  cut-off  valves are used for lowering the machine manually in situation of electrical power loss. If a lot more independent circuits are expected for your application please speak to us for availability.<br \/>Remark:  1. Please check with our sales engineer to the different pump displacement, motor power or tank capacity.<br \/>two. CSA or UL certified motors can be found upon request.<br \/>Specific Notes<br \/>one.\tThe AC motor is of S3 duty cycle, which might only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.<br \/>2.\tClean all of the hydraulic <img decoding=\"async\" src=\"https:\/\/img.hzpt.com\/1207\/POWER%20UNITS%20FOR%20DOUBLE-SCISSORS%20LIFT.jpg\" align=\"right\" width=\"293\" style=\"padding:10px;\" alt=\"\" title=\"\">elements concerned just before set up of  the power unit.<br \/>3.\tViscosity with the oil shoud be 15~46 cst,plus the oil must be clean and free of charge of impurities,N46 hydraulic oil is encouraged.<br \/>four.\tThe electrical power unit must be mounted vertically.<br \/>5.\tCheck the oil level within the tank right after the initial running in the electrical power unit.<br \/>6.\tOil changing is required following the preliminary 100 operation hrs,afterwards as soon as just about every 3000 hrs.<\/p>","protected":false},"excerpt":{"rendered":"<p>Standard DescriptionEquipped with the zero leak bidirectional checking sole-noid valves, this power unit is made for the operation of two independent circuits. Which are respectively for the principal and subordinate platforms in the double scissors lift. Two cut-off valves are used for lowering the machine manually in situation of electrical power loss. If a lot [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-3655","post","type-post","status-publish","format-standard","hentry","category-gear-coupling"],"_links":{"self":[{"href":"https:\/\/gear-coupling.top\/th\/wp-json\/wp\/v2\/posts\/3655","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gear-coupling.top\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gear-coupling.top\/th\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gear-coupling.top\/th\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gear-coupling.top\/th\/wp-json\/wp\/v2\/comments?post=3655"}],"version-history":[{"count":1,"href":"https:\/\/gear-coupling.top\/th\/wp-json\/wp\/v2\/posts\/3655\/revisions"}],"predecessor-version":[{"id":3656,"href":"https:\/\/gear-coupling.top\/th\/wp-json\/wp\/v2\/posts\/3655\/revisions\/3656"}],"wp:attachment":[{"href":"https:\/\/gear-coupling.top\/th\/wp-json\/wp\/v2\/media?parent=3655"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gear-coupling.top\/th\/wp-json\/wp\/v2\/categories?post=3655"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gear-coupling.top\/th\/wp-json\/wp\/v2\/tags?post=3655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}