Overview
Quick Details
Place of Origin:
Hebei, China
Brand Name:
OEM Brand
Model Number:
Customized
Plastic Modling Type:
Injection
Item:
Cast molded polyurethane pu plastic gear rack coupling
Material:
PA, ABS, POM, PP, PTFE, PE, PVC, TPU, etc, or any compound plastic
Size:
As per customer's requirements
Color:
Black,white,red,green,transparent or any color
Tolerance:

Cast molded polyurethane pu plastic gear rack coupling

Product Description

Product info

ItemCast molded polyurethane pu plastic gear rack couplingMaterialPA, ABS, POM, PP, PTFE, PE, PVC, TPU, etc, or any compound plasticSizeAs per customers’ requirmentColorAny color or according to Pantone colorsServiceOEM or ODMSamples1-2pcs of free samples are availableProduction basisProduct drawing, 3D files or exsiting samplesProcess TechnicHot processing molding, injection molding, extrusionTolerance±0.05mmCertificationRohs, FDA, ISO9001:2000Lead Time7-15 days for molding, 10-15days for mass productionApplicationAutomotive,Mechanical equipment,Construction,Home application,Aviation,Office facilitiesShipping & PaymentPackagingZiplock bag or bubble film plus cardboard boxes withwooden pallets outsideShippingMethodSea, Air, DHL, TNT, Fedex, UPS, etc.Payment Terms

Trade assurance, T/T, L/C, WesternUnion

Technology

Cast molded polyurethane pu plastic gear rack coupling are available in following material

(Any custom compound plasticis available)

  • PA6PA66PA6+GFPA66+GF
  • ABS, AS
  • POM, Delrin
  • PP
  • PE, LDPE, HDPE, UHMWPE
  • PTFE
  • PVC
  • PC, PMMA
  • PEEK
  • PS, PPS
  • PET, PBT
  • TPU, TPE

About Us

HEBEI JIANGZHI MACHINERY EQUIPMENT CO., LTD. is a professional manufacture for OEM mechanical parts in rubber & plastic & metal material.Products designing, mold making, production, packaging, inland logistics and international sales, and we can provide the best products and service at a competitive price.

FAQ

Q1. Are you manufacture or trade company?

A: We are manufacture.

Q2. What kind of payment do you accept?

A: Trade assurance, T/T, L/C, Weston Union are all accepted.

Q3. What is normal lead time?

A: Average 15-25days for tooling, bulk orders should be depends on quantity.

Q4. What is your standard package?

A: In general we use ziplock bag or bubble film plus cardboard boxes, wooden pallets or wooden cased will be used if necessary. Special packing method is available if needed.

Q5. What is the working life of the mould?

A: It depends on the parts we made. Besides,we will maintain or replace the mould by ourselves.

Q6. How many employees do you have?

A: We have 150 employees for factory, 45 employees for sales, 16 employees for technical support.